EnergyMetering
Installation and operating manual
electronic compact heat meter
with single-jet flow sensor ISF
M-Bus, wM-Bus and 3 inputs/outputs optional
All that counts.
Installation manual
General information ing Instruments Directive (MID). According to
With zelsius® C5-ISF you have acquired one of this directive, devices are no longer carrying an
the most up-to-date, modern heat meters cur- initial verification stamp, but rather the year of
rently available on the market. the declaration of conformity (recog-
nizable on the front of the device, for example:
Expressive symbols in the display and easy M12). The MID controls the use of heat meters
menu navigation make readout simple. Can be up to the moment they are placed on the market
operated with one single button. It is equipped resp. their first putting into use. After this, the
with a long-life battery made for operation dur- national regulations for devices subject to com-
ing the initial verification validity period (5 years) pulsory verification apply within the EU.
including a reserve of at least another year. The The duration of initial verification validity in Ger-
meter can be equipped optionally with a battery many remains 5 years for heat meters. After
lifetime of 11 years. this period has expired the measuring device
may no longer be used for billing in commercial
MID - Initial verification use.
zelsius® C5-ISF is produced and tested in The regulations resp. validity period may vary in
compliance with the new European Measur- other countries of the EU.
Technical data flow sensor ISF
Nominal flow gp 0,6 1,5 25
Maximum flow gs mh 1,2 3,0 50
Minimum flow gi horizontally* 12/24 30/60 50/100
Minimum flow qi vertically* 12/24 30/60 50/100
Starting flow horizontally ca. Ith 4 4 5
Pressure loss at gp bar bar
Temperature range °C 10°C <= 8, <=90°C
Measurement accuracy class 3
Nominal pressure PS/PN 16
Nominal diameter DN 15 15 20
Installation position horizontally or vertically, no upside down installation
Installation return flow optionally forward flow
Cable length up to calculator 12
(in version combi)
Installation place temperature sensors M10x 1
Heat carrier (Medium) water
* Standard: Ratio 25; optionally R50 but not for and non-symmetrical temperature sensors installation
2
Pulse inputs and outputs
(optional)
ZENNER International GmbH & Co. KG declares
that this product with the number of the EC type- By meters with pulse outputs, the pulse value
examination certificate DE-12-MI004-PTB010 can be called up in the display (see the display
complies with the requirements of the EC direc- overview, Level 4).
tives 2004/22/EC (Measuring instruments direc- The pulse value of the outputs is permanently set
tive) and 89/336/ EEC (electro-magnetic compa- and corresponds with the last position of the as-
tibility). sociated display value.
Electro-magnetic interference Example:
zelsius® C5-ISF fulfils the national and interna- Output 1 = energy output
tional requirements for interference resistance. Energy display = XXXXX.XXX
To avoid malfunctions due to other interfer- Last position = 0.001 MWh = 1 kWh
ences, do not install fluorescent lamps, switch Output pulse = 1 kWh
cabinets or electric devices such as motors or
pumps in the immediate vicinity of the meter
(minimum distance 1 m). Cables leaving the
meter should not be laid parallel to live cables
(230V) (minimum distance 0.2 m). 3..30V
Care instructions
Clean plastic surfaces with a damp cloth only. 400ms < 600ms
Do not use any scouring or aggressive cleaning
agents! The device is maintenance-free during
the service life. Repairs can only be made by the
manufacturer.
The most up-to-date information about this pro-
duct and of our installation notice can be found at GND
www.zenner.com. Eingang Ausgang
Technical data temperature sensors
Platinum resistance Pt 1000
Sensor diameter/type mm Standard: 5,0 (DS according to EN 1434); other sizes on demand
Temperature range 0-105
Cable length m 1,5 (opt. 5)
femp.-sensor by direct immersion or by immersion sleeves (in case of existing measuring points )
return by direct immersion or by immersion sleeves (in case of existing measuring points);
temp.-sensor optionally integrated in flow sensor
3
Technical data calculator
Temperature range °C 0...105
Temperature difference range K 3..80
Display LCD 8-digit + additional character
Ambient temperature EC 51.55
Minimum temperature diffence K 3 ( cooling or change-over: 2)
Resolution temperature °C 0,01
Measurement frequency s adjustable ex works, beginning with 2s, standard 30s
Unit to read the heat consumption Standard MWh; optionally kWh, GJ
Data storage 1 x daily
Due date values Storage of all monthly values during the entire operating time
Maximum value storage extensive storage of flow rate, performance and other parameters
Interface Standard optical interface (ZVEI, IrDA)
optional M-Bus, wM-Bus, RS485, radio
Supply 3,6 V lithium battery (different capacities)
Battery lifetime Years opt. > 11 (changeable during the operation time)
Protection class P54
EMC c
Highest permissible ambient temperature 55°C
- climatic Lowest permissible ambient temperature 5°C
Ambient conditions / Humidity class IP54
compact meter) class
- electro-magnetic
class =
colour connection signification Technical data 1/0
white 1101 In-/Output 1 Load max. max. 30V DC/20 mA
yellow 1102 In-/Output 2 1/101,2,3 Open Drain, n-channel FET
green 1/03 In-/Output 3 Cable D = 3.8 mm, 4-core
GND for Pulse-duty factor 1:1 (out); 1:5 (in)
Cable length
Input frequency max. 1 Hz
Technical data M-Bus
Cable length 1.5m A firmly attached cable is included: external
Cable 2:core wiring must be done by oneself.
a
M-Bus (optional)
The optional M-Bus interface complies with the 64 50
norm 1434-3 and operates with 2400 baud fixed. ee ; HN The two conductors can be connected in any or-
der to the M-Bus network. J
colour connection signification |
white M-Bus 2 M-Bus-Line 2 L
Compact version
Dimensions
Height act version: =
comp: version
Epa = 21 mm H2=25mm
(H1+H2): H, 65 2
E =21 mm ==
Connecting sizes
Nominal flow gp 06 15 25 3 CT _
Nominal diameter DN mm 15 15 20
Connecting L mm 110 110 130
+
length AS L
High mm 40 40 40 Gombiversion
Required minimum installation height min. = 30 mm
85
= a ja)
5
Installation instructions
General information menu (Level 3). ZENNER recommends to use
Read these instructions carefully right up to the direct temperature measurement and not to use
end before starting to mount the device! immersion sleeves.
The installation has to be done by qualified pro-
fessional personnel. The current laws and regu- Notes to installation of the flow sensor
lations have to be observed, especially EN1434 (VMT)
part 1+6, (in Germany also AGFW directive = Mount ball valves up- and downstream of the
FW202, FW510, FW218 and DIN4713 part 4 and VMT.
the initial verification directive). At devices with m Consider the correct installation point (sup-
M-Bus the general rules of technology and the ply or return). Normally this is the return pipe
respective regulations for electrical installations (cooler pipe at heating systems). Please note
have to be followed. the type plate information.
m Consider the correct flow direction. This is indi-
Make sure no heating water escapes during in- cated by an arrow on the side of the VMT.
stallation this can cause burns! Install horizontally or vertically only, not tilted,
inclined or overhead. Installation into horizon-
The maximum heating water temperature at the tal or upstreaming or downstreaming pipelines.
flow sensor may not exceed 90°C. =m Do not install at highest point of piping to avoid
For heating systems with a lack of temperature air inside the flow sensor.
mixing resp. with temperature stratification a Consider the dimensions of the heat meter.
straight pipeline of min. 10xDN has to be pro- Keep about 1 meter distance between zelsius® 2
vided upstream of the meter. It is important to C5-ISF and electromagnetic sources of inter-
ensure adequate system pressure to avoid cavi- ference like switch cabinets, motors or pumps. g
tation. Keep about 0.2 m distance to power cables.
To mount the heat computer of the C5-ISF in Keep min. 3 cm free mounting space around 3
combi version on the wall, the supplied mounting the device.
adapter has to be used. The review of the ap- £
proval can be identified definitely in the display
ZENNER International GmbH & Co. KG
Romerstadt 6
Telephone +49 681 99 676-30
Telefax +49 681 99 676-3100
E-Mail info@zenner.com 3
Internet www.zenner.com a
6
Notes ball valves easy to read enabling optimum use of the space
= Mount ball valves up- and downstream of the available for installation of the flow meter.
meter.
m= Mount a ball valve with bore M10x1 for direct Installing the temperature sensor
sensors in the supply. This is required for the The installation of the temperature sensors
installation of the supply sensor should be preferably symmetrical and direct
m For symmetrical temperature sensor installa- installation.
tion, mount an identical ball valve in the return. m Do not remove the return sensor if already
This one is used for mounting the return sensor. mounted in the VMU.This is also valid for all
the safety seals which are mounted on the de-
Mounting heating- / cooling energy meter vice as standard.
m Flush the system thoroughly before installing = Sensors are colour-coded (red = supply, blue
the heating-/cooling energy meter. = return).
m Close valves and release pressure. =m The connecting cables may not be buckled, ex-
Dismount the existing flow sensor or meter blank. tended or shortened.
m Use only new and flawless sealing material The seal at the sensor installation point on the
and check the seal face for damage. measuring capsule may not be damaged.
m Install the new flow sensor according to the = Remove locking screw and seal at the ball
correct flow direction and installation position. valve completely, if existing.
= Turn heat computer to desired reading position. um Attach the O-ring to the installation aid (the 2nd
O-ring is only a spare O-ring).
Information: The best measuring results can be m Using the installation aid, insert the O-ring into
achieved by mounting with horizontal diallevel. the installation point according to DIN EN 1434
Combi-devices are, for example, used in tight with a slight circular motion.
installation points without room for the calculator m Using the other end of the installation aid bring
on the flow sensor or when the calculator is dif- the O-ring into the correct position.
ficult to read. Therefore the device still remains Insert the 2 halves of the plastic connector into
the sensor's three notches (crimps) and press
them together.
. m Use the installation aid as positioning aid.
0 = Insert the temperature sensor into the installa-
tion point and screw it in tightly until the dead
| stop of the seal on the 12-point is reached
=
i (mounting torque 3-5 Nm).
i LL The sensor optional integrated in the VMT has
mi == to be secured
Sm m Secure the sensor after installation against
unauthorised removal with appropriate sealing
Montage DF- Adapter (available as a sealing set).
7
|
Putting into use Note relating to the mounting in existing im-
m= Open valves carefully and check installation for mersion sleeves:
leakage. The device C5 can be put into use in connection
m If the sleep mode of the counter is enabled with existing immersion sleeves in accordance
(Display: SLEEP 1), then it must be deactivat- with the article "Putting into use of MID homolo-
ed by longer pressing the button (>5s). gated temperature sensors" released in the PTB
While the system is operating, check whether notifications 119 (2009), vol.6.
the volume display advances and the tem- Based on current information, the regulation has
peratures displayed correspond with the actual a period of validity until 30.10.2016. For the iden-
temperatures (see the display overview). tification
m= Wait for the temperature display to be updated and marking of the usable existing immersion
(1-2 sec). sleeves in connection with the C5 device, an
m Secure meter with the enclosed sealing mate- identification and marking set can be delivered
rial against unauthorised removal. from our company.
Fill in the putting into use report in accordance
with PTB-Directive TR K9.
Asymmetrical sensor installation for zelsius® C5-ISF with the return
sensor integrated in the flow sensor
|
Supply
'Symmetrical sensor installation for zelsius® C5-ISF
8
Status display / Error codes
The symbols in the table below show the meter's operational status. The status messages only appear in
the main display (energy)! The temporary display of the warning triangle can be caused by special operat-
ing states and does not always mean that the device is malfunctioning. However, should the symbol be
displayed over a longer period of time, you should contact the service company.
Symbol Status Event
| External voltage -
Flow existent -
A Attention! Check system / device for errors
( ) Symbol flashing: Data transmission -
Symbol constantly displayed: optical interface active =
/A\ fel Emergency operation Exchange device
Error codes show faults detected by zelsius® C5-ISF. If more than one error appears, the sum of the
error codes is displayed: Error 1005 = error 1000 and error 5.
Code Error Event
1 Temperature out of measuring range Check sensors
2 Temperature out of measuring range Check sensors
3 Short-circuit return sensor Check sensors
4 Interruption return sensor Check sensors
5 Short-circuit supply sensor Check sensors
6 Interruption supply sensor Check sensors
7 Battery voltage Exchange device
8 Hardware error Exchange device
9 Hardware error Exchange device
100 Hardware error Exchange device
800 Wireless interface Exchange device
1000 Status end of the battery Exchange device respectively battery*
2000 Status Initial verification expired Exchange device
* Due to certification reasons, change of the battery only possible abroad.
9
Ebene 1 Ebene 2 Important Note:
The optical interface has to be activated by
IP > means of the OptoHead through keypress before
from reading out of the de vice.
To = [ 3h)
Cooling energy Cooling energy Devices, which are in sleep mode (Display: om last due date to now
SLEEP 1) have to be activated through keypress
Segment test Heal energy difference from until the energy display shows up. 1. this month to now
Date last due date Cooling energy difference fror Depending on you meter's model
1. this month to now
0 = its displays can differ in number and order from ts displ diff d order fi
Energy Volume difference from those shown here.
Last due date 1. this month to now
Due date rs energy Maximal Flow Legend
V Press the button briefly (S) to switch
Volume
Date month through the display from top to bottom.
= When you have reached the last menu
Maximum power, Average val item the device automatically jumps back
since commissioning
= = FE to the menu item at the top (loop).
8120°C 25003 w
Supply temperature Maximum heat energy
power month
= = > Press the button for about 2 seconds (L),
3548°C 5862 w it
for th
energy pow
wait for the door symbol to appear (upper
right corner of the display) and then re-
729] i
=
25003 lease the button. The menu is then upda- difference Maximum cooling energy
power month ted resp. switches to the sub-menu.
v
Hold down the button (H) until the device
switches to another level or switches back
= from the sub-menu.
v
A detailed display overview including sub-
menus is available upon request.
* Function only available in variant zelsius C5 Meter"
10
Ebene 3 Ebene 4 Setting of water-glycol-mixtures
for zelsius C5 Meter"
Level 1 Selection of the display ,E 0"
on Level 1
Serial number Pulse value a
Press the button for about 2
Model number Pulse value seconds until letter ,E" flashes
Input 3 £0
v End of the batiery With each short press on the
button the following loop for dif-
ferent mixing ratios runs:
E20-E25-E30-E35-E40-E45-E50
_
E = ethylene glycol
P = propylene glycol
E 0 = water without glycol additive
Operation hours
Upon reaching the required value, press the but-
Primary M-Bus address
ton for about 2 seconds to program the value.
Buchstabe Letter "E" or "P" will stop flashing.
The programming process can be retried if nec-
essary,
Firmware version
Function
Output 1
Function
Output 2
Function
Output 3
Opto readout energy
11
Disposal
Attention: This device contains a non-remova- Attention:
ble and non-rechargeable lithium battery. Do not dispose of the devices with domestic
Batteries contain substances, which could harm waste.
the environment and might endanger human In this way, you will help to protect natural re-
health if not disposed of properly. sources and to promote the sustainable reuse
of material resources.
To reduce the disposal quantity so as unavoid-
able pollutants from electrical and electronic
equipment in waste, old equipment should be
reused prior or materials recycled or reused as
another form.
This is only possible if old equipment, which con- For any question, please contact
tains batteries or other accessories are disposed. info@zenner.com
Therefore please contact the department of your
local authority which is responsible for waste
disposal. Alternatively a waste disposal via
ZENNER is possible.
Your local or municipal authority or the local
waste disposal company can give you informa- The most up-to-date information about this prod-
tion relating the collection points for your used uct and of our installation notice can be found at
equipments. www.zenner.com